Proceedings of the ... International Conference on Offshore Mechanics and Arctic Engineering, Volume 15, Part 6American Society of Mechanical Engineers, 1996 - Arctic regions |
From inside the book
Results 1-3 of 26
Page 37
The configurations of isolated buoyancy - tool systems raised and lowered by means of a deployment line from the surface formed the ... chain weights , clump weights , and buoyancy characteristics ( near surface or deep deployed ) .
The configurations of isolated buoyancy - tool systems raised and lowered by means of a deployment line from the surface formed the ... chain weights , clump weights , and buoyancy characteristics ( near surface or deep deployed ) .
Page 38
3 " ORQ CHAIN TO 1.257 LOWERING LINE DEPLOYMENT FRAME 4 4 OCEAN SERVICE CLASS SUPPORT VESSEL WITH DP 2 " ORO CHAIN 3 ... This is usually before the buoy - package subsystem has deployed the intervention package , and the deployment line ...
3 " ORQ CHAIN TO 1.257 LOWERING LINE DEPLOYMENT FRAME 4 4 OCEAN SERVICE CLASS SUPPORT VESSEL WITH DP 2 " ORO CHAIN 3 ... This is usually before the buoy - package subsystem has deployed the intervention package , and the deployment line ...
Page 39
This avoids the likelihood of entanglement between the wire lines in the deployment and the buoy - package subsystems . ... weight at the end of the deployment line to avoid slack line conditions during fully deployed dynamic response .
This avoids the likelihood of entanglement between the wire lines in the deployment and the buoy - package subsystems . ... weight at the end of the deployment line to avoid slack line conditions during fully deployed dynamic response .
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
Operational | 1 |
Technological Problems Associated With Subsea Development of High Pressure | 17 |
Gianfederico Citi Stuart Cowen and Alessandro Radicioni | 23 |
Copyright | |
10 other sections not shown
Other editions - View all
Common terms and phrases
addition alignment allow applications boosting bore buoyancy cable carried clamps completion configuration connection connector considered construction cost deep deepwater deployed deployment DFCS disturbance drilling effective Engineers equipment experience field Figure flow flowline fluid force function hydraulic improved increase inspection installation integration Italy Joint jumper learning length limited loads located lower maintenance manipulator means measurement mechanical method Mode motion multiphase objective offshore operation package performed phase pipe pipeline Popeye position possible present pressure problems production production system pump reference relative reliability response retrieval riser seal simulation Sonsub Spanner Joint spool structure subsea surface tasks tie-in tool trajectory Tree tubing hanger tunnel umbilical unit valves vehicle vertical vessel water depth weight winch