CONTENTS 1 17 23 37 45 Deepwater Completion Workover Riser and Control System : Operational Experience and Lessons Learned William C. Parks and Dana C. Beebe Technological Problems Associated With Subsea Development of High Pressure and ...
CONTENTS 1 17 23 37 45 Deepwater Completion Workover Riser and Control System : Operational Experience and Lessons Learned William C. Parks and Dana C. Beebe Technological Problems Associated With Subsea Development of High Pressure and ...
Page 26
From the experience gained during this operation it has been shown that the system of a subsea MV providing locally ... the operation was experienced due to some difficulties in the recovery of the FTU Protection Cap ; the activity was ...
From the experience gained during this operation it has been shown that the system of a subsea MV providing locally ... the operation was experienced due to some difficulties in the recovery of the FTU Protection Cap ; the activity was ...
Page 61
The Electrical Chain The start up sequences experienced during the functional tests phase phase has demonstrated the ... Further to the above , the experience with the interaction between the boosting equipment and the wells productive ...
The Electrical Chain The start up sequences experienced during the functional tests phase phase has demonstrated the ... Further to the above , the experience with the interaction between the boosting equipment and the wells productive ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
Operational | 1 |
Technological Problems Associated With Subsea Development of High Pressure | 17 |
Gianfederico Citi Stuart Cowen and Alessandro Radicioni | 23 |
Copyright | |
10 other sections not shown
Other editions - View all
Common terms and phrases
addition alignment allow applications boosting bore buoyancy cable carried clamps completion configuration connection connector considered construction cost deep deepwater deployed deployment DFCS disturbance drilling effective Engineers equipment experience field Figure flow flowline fluid force function hydraulic improved increase inspection installation integration Italy Joint jumper learning length limited loads located lower maintenance manipulator means measurement mechanical method Mode motion multiphase objective offshore operation package performed phase pipe pipeline Popeye position possible present pressure problems production production system pump reference relative reliability response retrieval riser seal simulation Sonsub Spanner Joint spool structure subsea surface tasks tie-in tool trajectory Tree tubing hanger tunnel umbilical unit valves vehicle vertical vessel water depth weight winch