Integration and testing are more operative phases and therefore a team composed of several Agip engineers , with a ... was decided to built up an integrated team composed by : Agip engineers with drilling and production experience ...
Integration and testing are more operative phases and therefore a team composed of several Agip engineers , with a ... was decided to built up an integrated team composed by : Agip engineers with drilling and production experience ...
Page 94
It is important that each new umbilical and connector design be integrated to work with the DFCS at an early stage of ... TEST PROGRAM During March - May 1995 , Sonsub conducted a complete System Integration Test ( SIT ) of the DFCS and ...
It is important that each new umbilical and connector design be integrated to work with the DFCS at an early stage of ... TEST PROGRAM During March - May 1995 , Sonsub conducted a complete System Integration Test ( SIT ) of the DFCS and ...
Page 97
The project is aimed at the full development of those key technologies and their integration into a system solution applicable to a standard work class ROV in order to provide ROV operators with a general purpose tool that can be ...
The project is aimed at the full development of those key technologies and their integration into a system solution applicable to a standard work class ROV in order to provide ROV operators with a general purpose tool that can be ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
Operational | 1 |
Technological Problems Associated With Subsea Development of High Pressure | 17 |
Gianfederico Citi Stuart Cowen and Alessandro Radicioni | 23 |
Copyright | |
10 other sections not shown
Other editions - View all
Common terms and phrases
addition alignment allow applications boosting bore buoyancy cable carried clamps completion configuration connection connector considered construction cost deep deepwater deployed deployment DFCS disturbance drilling effective Engineers equipment experience field Figure flow flowline fluid force function hydraulic improved increase inspection installation integration Italy Joint jumper learning length limited loads located lower maintenance manipulator means measurement mechanical method Mode motion multiphase objective offshore operation package performed phase pipe pipeline Popeye position possible present pressure problems production production system pump reference relative reliability response retrieval riser seal simulation Sonsub Spanner Joint spool structure subsea surface tasks tie-in tool trajectory Tree tubing hanger tunnel umbilical unit valves vehicle vertical vessel water depth weight winch