Proceedings of the ... International Conference on Offshore Mechanics and Arctic Engineering, Volume 15, Part 6American Society of Mechanical Engineers, 1996 - Arctic regions |
From inside the book
Results 1-3 of 23
Page 39
... length of chain required . These chains are needed for the following : Provide enough weight at the end of the deployment line to avoid slack line conditions during fully deployed dynamic response . Provide enough weight to avoid " snap ...
... length of chain required . These chains are needed for the following : Provide enough weight at the end of the deployment line to avoid slack line conditions during fully deployed dynamic response . Provide enough weight to avoid " snap ...
Page 46
... length of umbilical together with a traction type storage winch was manufactured . As part of the acceptance test procedure for the umbilical arrangement the system was mobilised together with a Sea Twin ROV . Full scale tests were ...
... length of umbilical together with a traction type storage winch was manufactured . As part of the acceptance test procedure for the umbilical arrangement the system was mobilised together with a Sea Twin ROV . Full scale tests were ...
Page 107
... length , pipe size , available footprint area on the sea floor and external loads , among other factors . Pipe spools which are in a single plane with vertical connections ( Figs . 2 & 3 ) on either end , and free spans over the length ...
... length , pipe size , available footprint area on the sea floor and external loads , among other factors . Pipe spools which are in a single plane with vertical connections ( Figs . 2 & 3 ) on either end , and free spans over the length ...
Contents
Operational | 1 |
Technological Problems Associated With Subsea Development of High Pressure | 17 |
New Concept for a General Purpose Subsea Installation System | 23 |
Copyright | |
10 other sections not shown
Other editions - View all
Common terms and phrases
Agip alignment ball valves boosting unit bore buoy buoyancy cable chain clamps completion configuration connection control force Control System cost crane vessel deep water deepwater deployed deployment line DFCS DIVERLESS downhole drilling end effector equipment feedback field Figure flowline flowline connector fluid Gulf of Mexico heave compensated horizontal Hurricane Opal hydrate hydraulic inspection integration interface jumper LAPV loads located lube oil measurement meters modules motion Motion Compensation multiphase boosting multiphase flow objective trajectory offshore operation package performed phase pipe pipeline Popeye Popeye installation position pressure pull-in pump realized trajectory retrieval Riser and Control riser joint RUNNING TOOL SAF system Scene Reconstruction simulation skid Snamprogetti Sonsub spool Statoil subsea production system subsea structure subsea tree Surface Tree tasks TElerobotic thrusters tie-in tubing hanger tunnel umbilical underwater valves vehicle vessel water depth wellhead winch wireline WOCS