Proceedings of the ... International Conference on Offshore Mechanics and Arctic Engineering, Volume 15, Part 6American Society of Mechanical Engineers, 1996 - Arctic regions |
From inside the book
Results 1-3 of 14
Page 8
... located in the MCU . The cable is 4,000 ' long and contains seven twisted , shielded conductor pairs protected by a galvanized steel armor package . The cable is terminated with a surface mateable electrical connector rated for 6,000 ...
... located in the MCU . The cable is 4,000 ' long and contains seven twisted , shielded conductor pairs protected by a galvanized steel armor package . The cable is terminated with a surface mateable electrical connector rated for 6,000 ...
Page 38
... located at the bottom of the line . This is usually before the buoy - package subsystem has deployed the intervention package , and the deployment line is therefore supporting a maximum dead load ( Fig . 2 labelled " Before Release of ...
... located at the bottom of the line . This is usually before the buoy - package subsystem has deployed the intervention package , and the deployment line is therefore supporting a maximum dead load ( Fig . 2 labelled " Before Release of ...
Page 59
... located at the process interconnecting skid interfacing the platform production system ; • ⚫ direct interaction of the pumping system with both the producing wells and the multiphase export line ; ⚫ evaluation of degradation effects ...
... located at the process interconnecting skid interfacing the platform production system ; • ⚫ direct interaction of the pumping system with both the producing wells and the multiphase export line ; ⚫ evaluation of degradation effects ...
Contents
Operational | 1 |
Technological Problems Associated With Subsea Development of High Pressure | 17 |
New Concept for a General Purpose Subsea Installation System | 23 |
Copyright | |
10 other sections not shown
Other editions - View all
Common terms and phrases
Agip alignment ball valves boosting unit bore buoy buoyancy cable chain clamps completion configuration connection control force Control System cost crane vessel deep water deepwater deployed deployment line DFCS DIVERLESS downhole drilling end effector equipment feedback field Figure flowline flowline connector fluid Gulf of Mexico heave compensated horizontal Hurricane Opal hydrate hydraulic inspection integration interface jumper LAPV loads located lube oil measurement meters modules motion Motion Compensation multiphase boosting multiphase flow objective trajectory offshore operation package performed phase pipe pipeline Popeye Popeye installation position pressure pull-in pump realized trajectory retrieval Riser and Control riser joint RUNNING TOOL SAF system Scene Reconstruction simulation skid Snamprogetti Sonsub spool Statoil subsea production system subsea structure subsea tree Surface Tree tasks TElerobotic thrusters tie-in tubing hanger tunnel umbilical underwater valves vehicle vessel water depth wellhead winch wireline WOCS