... performed on the Luna 40 well in 180 m w.d .. The system successfully installed the christmas tree , flowline jumpers , control system and high pressure cap as well as deploying the LMRP to allow the commissioning of the well . The SAF ...
... performed on the Luna 40 well in 180 m w.d .. The system successfully installed the christmas tree , flowline jumpers , control system and high pressure cap as well as deploying the LMRP to allow the commissioning of the well . The SAF ...
Page 26
... performed on board before launching . The XT was installed using the XTIM and the MV connected to the Completion Riser , the activity was completed on 01.07.95 ( see Fig . 7 ) . 4. Following XT the PJMs were installed using the FJIM and ...
... performed on board before launching . The XT was installed using the XTIM and the MV connected to the Completion Riser , the activity was completed on 01.07.95 ( see Fig . 7 ) . 4. Following XT the PJMs were installed using the FJIM and ...
Page 94
... perform a simulation of the entire tie - in operation . All tasks to be completed were performed as closely as possible to the subsea environment using cameras and manipulators on an ROV . Flowline loads were imposed with winches to ...
... perform a simulation of the entire tie - in operation . All tasks to be completed were performed as closely as possible to the subsea environment using cameras and manipulators on an ROV . Flowline loads were imposed with winches to ...
Contents
Operational | 1 |
Technological Problems Associated With Subsea Development of High Pressure | 17 |
New Concept for a General Purpose Subsea Installation System | 23 |
Copyright | |
10 other sections not shown
Other editions - View all
Common terms and phrases
Agip alignment ball valves boosting unit bore buoy buoyancy cable chain clamps completion configuration connection control force Control System cost crane vessel deep water deepwater deployed deployment line DFCS DIVERLESS downhole drilling end effector equipment feedback field Figure flowline flowline connector fluid Gulf of Mexico heave compensated horizontal Hurricane Opal hydrate hydraulic inspection integration interface jumper LAPV loads located lube oil measurement meters modules motion Motion Compensation multiphase boosting multiphase flow objective trajectory offshore operation package performed phase pipe pipeline Popeye Popeye installation position pressure pull-in pump realized trajectory retrieval Riser and Control riser joint RUNNING TOOL SAF system Scene Reconstruction simulation skid Snamprogetti Sonsub spool Statoil subsea production system subsea structure subsea tree Surface Tree tasks TElerobotic thrusters tie-in tubing hanger tunnel umbilical underwater valves vehicle vessel water depth wellhead winch wireline WOCS