Page 27
To note that to define the running tools and the installation / maintenance procedures necessary to individuate possible references subsea field architectures . This was perforned both selecting a number of references deepwater fields ...
To note that to define the running tools and the installation / maintenance procedures necessary to individuate possible references subsea field architectures . This was perforned both selecting a number of references deepwater fields ...
Page 48
The survey results can be transferred onto a single CD which is easily transported or despatched to interested parties . much larger sections and to accommodate more detail than was possible at the tests . The computer supplied by ...
The survey results can be transferred onto a single CD which is easily transported or despatched to interested parties . much larger sections and to accommodate more detail than was possible at the tests . The computer supplied by ...
Page 70
Because there are no significant relative motions between the template and the SCR , rigging wires can remain very short or a fixed connection is possible . A second method is rigging on the cargo barge .
Because there are no significant relative motions between the template and the SCR , rigging wires can remain very short or a fixed connection is possible . A second method is rigging on the cargo barge .
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
Operational | 1 |
Technological Problems Associated With Subsea Development of High Pressure | 17 |
Gianfederico Citi Stuart Cowen and Alessandro Radicioni | 23 |
Copyright | |
10 other sections not shown
Other editions - View all
Common terms and phrases
addition alignment allow applications boosting bore buoyancy cable carried clamps completion configuration connection connector considered construction cost deep deepwater deployed deployment DFCS disturbance drilling effective Engineers equipment experience field Figure flow flowline fluid force function hydraulic improved increase inspection installation integration Italy Joint jumper learning length limited loads located lower maintenance manipulator means measurement mechanical method Mode motion multiphase objective offshore operation package performed phase pipe pipeline Popeye position possible present pressure problems production production system pump reference relative reliability response retrieval riser seal simulation Sonsub Spanner Joint spool structure subsea surface tasks tie-in tool trajectory Tree tubing hanger tunnel umbilical unit valves vehicle vertical vessel water depth weight winch