Proceedings of the ... International Conference on Offshore Mechanics and Arctic Engineering, Volume 15, Part 6American Society of Mechanical Engineers, 1996 - Arctic regions |
From inside the book
Results 1-3 of 30
Page 4
They can be used to isolate the bores , allow circulation of the riser and / or the well bore , and to shut - in the well . During the Popeye installation , the BOP Spanner Joint was only partially successful in its first offshore use .
They can be used to isolate the bores , allow circulation of the riser and / or the well bore , and to shut - in the well . During the Popeye installation , the BOP Spanner Joint was only partially successful in its first offshore use .
Page 5
The pin end has four slots that match four dogs on the riser spider gates at 90 degree spacing to position the riser joint during the tightening of the nut and to aid in aligning the riser string while running . The riser joints and ...
The pin end has four slots that match four dogs on the riser spider gates at 90 degree spacing to position the riser joint during the tightening of the nut and to aid in aligning the riser string while running . The riser joints and ...
Page 6
It was noted by viewing the rotation of the Surface Tree upon landing , the riser had rotated only approximately 30 degrees . Moreover , as the tubing hanger was landed , the riser string of 41 joints had a calculated 6 " total stretch ...
It was noted by viewing the rotation of the Surface Tree upon landing , the riser had rotated only approximately 30 degrees . Moreover , as the tubing hanger was landed , the riser string of 41 joints had a calculated 6 " total stretch ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
Operational | 1 |
Technological Problems Associated With Subsea Development of High Pressure | 17 |
Gianfederico Citi Stuart Cowen and Alessandro Radicioni | 23 |
Copyright | |
10 other sections not shown
Other editions - View all
Common terms and phrases
addition alignment allow applications boosting bore buoyancy cable carried clamps completion configuration connection connector considered construction cost deep deepwater deployed deployment DFCS disturbance drilling effective Engineers equipment experience field Figure flow flowline fluid force function hydraulic improved increase inspection installation integration Italy Joint jumper learning length limited loads located lower maintenance manipulator means measurement mechanical method Mode motion multiphase objective offshore operation package performed phase pipe pipeline Popeye position possible present pressure problems production production system pump reference relative reliability response retrieval riser seal simulation Sonsub Spanner Joint spool structure subsea surface tasks tie-in tool trajectory Tree tubing hanger tunnel umbilical unit valves vehicle vertical vessel water depth weight winch