Proceedings of the ... International Conference on Offshore Mechanics and Arctic Engineering, Volume 15, Part 6American Society of Mechanical Engineers, 1996 - Arctic regions |
From inside the book
Results 1-3 of 16
Page 4
Prior to mating the Spanner Joint with the tubing hanger , functional verification of the ball valves was confirmed at the rig floor using a simple flow test . The Spanner Joint with the concentric riser was then ...
Prior to mating the Spanner Joint with the tubing hanger , functional verification of the ball valves was confirmed at the rig floor using a simple flow test . The Spanner Joint with the concentric riser was then ...
Page 5
After all repairs , the Spanner Joint was returned to the rig for well A - 2 tubing hanger operations ; however , during hookup procedures on the rig floor , the ball valves failed to pass the functional verification testing prior to ...
After all repairs , the Spanner Joint was returned to the rig for well A - 2 tubing hanger operations ; however , during hookup procedures on the rig floor , the ball valves failed to pass the functional verification testing prior to ...
Page 10
In the Tubing Hanger Mode , the WOCS will continue to function as a direct hydraulic system with a new hydraulic umbilical and reel . At the time of this paper , it has not been decided whether a DAS electrical cable will be required in ...
In the Tubing Hanger Mode , the WOCS will continue to function as a direct hydraulic system with a new hydraulic umbilical and reel . At the time of this paper , it has not been decided whether a DAS electrical cable will be required in ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
Operational | 1 |
Technological Problems Associated With Subsea Development of High Pressure | 17 |
Gianfederico Citi Stuart Cowen and Alessandro Radicioni | 23 |
Copyright | |
10 other sections not shown
Other editions - View all
Common terms and phrases
addition alignment allow applications boosting bore buoyancy cable carried clamps completion configuration connection connector considered construction cost deep deepwater deployed deployment DFCS disturbance drilling effective Engineers equipment experience field Figure flow flowline fluid force function hydraulic improved increase inspection installation integration Italy Joint jumper learning length limited loads located lower maintenance manipulator means measurement mechanical method Mode motion multiphase objective offshore operation package performed phase pipe pipeline Popeye position possible present pressure problems production production system pump reference relative reliability response retrieval riser seal simulation Sonsub Spanner Joint spool structure subsea surface tasks tie-in tool trajectory Tree tubing hanger tunnel umbilical unit valves vehicle vertical vessel water depth weight winch