... tubing hanger . Prior to mating the Spanner Joint with the tubing hanger , functional verification of the ball valves was confirmed at the rig floor using a simple flow test . The Spanner Joint with the concentric riser was then run ...
... tubing hanger . Prior to mating the Spanner Joint with the tubing hanger , functional verification of the ball valves was confirmed at the rig floor using a simple flow test . The Spanner Joint with the concentric riser was then run ...
Page 5
... tubing hanger operations ; however , during hookup procedures on the rig floor , the ball valves failed to pass the functional verification testing prior to mating the Spanner Joint to the tubing hanger . The ball valve actuators were ...
... tubing hanger operations ; however , during hookup procedures on the rig floor , the ball valves failed to pass the functional verification testing prior to mating the Spanner Joint to the tubing hanger . The ball valve actuators were ...
Page 8
... tubing hanger on well A - 1 . The readings were satisfactory until the tubing hanger was landed in the wellhead ; readings then became erratic . The rig was abandoned due to the hurricane and after we returned , the DAS cable was found ...
... tubing hanger on well A - 1 . The readings were satisfactory until the tubing hanger was landed in the wellhead ; readings then became erratic . The rig was abandoned due to the hurricane and after we returned , the DAS cable was found ...
Contents
Operational | 1 |
Technological Problems Associated With Subsea Development of High Pressure | 17 |
New Concept for a General Purpose Subsea Installation System | 23 |
Copyright | |
10 other sections not shown
Other editions - View all
Common terms and phrases
Agip alignment ball valves boosting unit bore buoy buoyancy cable chain clamps completion configuration connection control force Control System cost crane vessel deep water deepwater deployed deployment line DFCS DIVERLESS downhole drilling end effector equipment feedback field Figure flowline flowline connector fluid Gulf of Mexico heave compensated horizontal Hurricane Opal hydrate hydraulic inspection integration interface jumper LAPV loads located lube oil measurement meters modules motion Motion Compensation multiphase boosting multiphase flow objective trajectory offshore operation package performed phase pipe pipeline Popeye Popeye installation position pressure pull-in pump realized trajectory retrieval Riser and Control riser joint RUNNING TOOL SAF system Scene Reconstruction simulation skid Snamprogetti Sonsub spool Statoil subsea production system subsea structure subsea tree Surface Tree tasks TElerobotic thrusters tie-in tubing hanger tunnel umbilical underwater valves vehicle vessel water depth wellhead winch wireline WOCS