The EDP is comprised of a hydraulic connector and a valve block with three integral gate valves . It allows the CRS to be disconnected above the LWRP in an emergency situation , leaving the well in a safe shut - in condition .
The EDP is comprised of a hydraulic connector and a valve block with three integral gate valves . It allows the CRS to be disconnected above the LWRP in an emergency situation , leaving the well in a safe shut - in condition .
Page 8
The SCU is used in the tree mode only and contains all of the control valves , accumulators , etc. , required to operate the EDP , LWRP , and subsea tree . It is mounted on the EDP as an integral part of the EDP assembly and provides ...
The SCU is used in the tree mode only and contains all of the control valves , accumulators , etc. , required to operate the EDP , LWRP , and subsea tree . It is mounted on the EDP as an integral part of the EDP assembly and provides ...
Page 18
3.1 Functional Specifications d ) There are no large size valves for the subsea manifold available when rated at the wellhead shut in pressure . Further limitations on subsea valves and production string are due to close coupling of the ...
3.1 Functional Specifications d ) There are no large size valves for the subsea manifold available when rated at the wellhead shut in pressure . Further limitations on subsea valves and production string are due to close coupling of the ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
Operational | 1 |
Technological Problems Associated With Subsea Development of High Pressure | 17 |
Gianfederico Citi Stuart Cowen and Alessandro Radicioni | 23 |
Copyright | |
10 other sections not shown
Other editions - View all
Common terms and phrases
addition alignment allow applications boosting bore buoyancy cable carried clamps completion configuration connection connector considered construction cost deep deepwater deployed deployment DFCS disturbance drilling effective Engineers equipment experience field Figure flow flowline fluid force function hydraulic improved increase inspection installation integration Italy Joint jumper learning length limited loads located lower maintenance manipulator means measurement mechanical method Mode motion multiphase objective offshore operation package performed phase pipe pipeline Popeye position possible present pressure problems production production system pump reference relative reliability response retrieval riser seal simulation Sonsub Spanner Joint spool structure subsea surface tasks tie-in tool trajectory Tree tubing hanger tunnel umbilical unit valves vehicle vertical vessel water depth weight winch