Proceedings of the ... International Conference on Offshore Mechanics and Arctic Engineering, Volume 15, Part 6American Society of Mechanical Engineers, 1996 - Arctic regions |
From inside the book
Results 1-3 of 19
Page 42
Figure 9 depicts : ( a ) a regular wave input with period 6 sec . and amplitude of 7.48 ft ( expected maximum stern heave in a 3 - hour storm ) , ( b ) the vertical motion at the chain location , and ( c ) the vertical motion at the ...
Figure 9 depicts : ( a ) a regular wave input with period 6 sec . and amplitude of 7.48 ft ( expected maximum stern heave in a 3 - hour storm ) , ( b ) the vertical motion at the chain location , and ( c ) the vertical motion at the ...
Page 66
Various options to deliver the vertical force are evaluated on their qualities , advantages and disadvantages . The forces are divided over the location where the force is generated , at the surface , in the water column or via the ...
Various options to deliver the vertical force are evaluated on their qualities , advantages and disadvantages . The forces are divided over the location where the force is generated , at the surface , in the water column or via the ...
Page 107
Though the engineering required for these spools is less than for single - plane spools with vertical connections on either end , the associated hardware cost and fabrication / installation time could be higher .
Though the engineering required for these spools is less than for single - plane spools with vertical connections on either end , the associated hardware cost and fabrication / installation time could be higher .
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
Operational | 1 |
Technological Problems Associated With Subsea Development of High Pressure | 17 |
Gianfederico Citi Stuart Cowen and Alessandro Radicioni | 23 |
Copyright | |
10 other sections not shown
Other editions - View all
Common terms and phrases
addition alignment allow applications boosting bore buoyancy cable carried clamps completion configuration connection connector considered construction cost deep deepwater deployed deployment DFCS disturbance drilling effective Engineers equipment experience field Figure flow flowline fluid force function hydraulic improved increase inspection installation integration Italy Joint jumper learning length limited loads located lower maintenance manipulator means measurement mechanical method Mode motion multiphase objective offshore operation package performed phase pipe pipeline Popeye position possible present pressure problems production production system pump reference relative reliability response retrieval riser seal simulation Sonsub Spanner Joint spool structure subsea surface tasks tie-in tool trajectory Tree tubing hanger tunnel umbilical unit valves vehicle vertical vessel water depth weight winch