Proceedings of the ... International Conference on Offshore Mechanics and Arctic Engineering, Volume 15, Part 6American Society of Mechanical Engineers, 1996 - Arctic regions |
From inside the book
Results 1-3 of 23
Page 10
... water depth . The existing riser joints and couplings were already designed and tested for the loads required up to a water depth of 6,000 ' without buoyancy ; the length of each joint was the only consideration . It has been decided to ...
... water depth . The existing riser joints and couplings were already designed and tested for the loads required up to a water depth of 6,000 ' without buoyancy ; the length of each joint was the only consideration . It has been decided to ...
Page 43
... WATER DEPTH 1.25 " LOWERING LINE 5 300 ' NYLON 60mm CORNWALL 3 - STRAND / 8 - STRAND MULTIPLAIT 210 OF 2 " ORQ +8,500 lb CLUMP 20.0 0.0 0 10 20 20 TIME ( SEC ) AFTER ... water depth , but allowing intervention beyond 5,000 ft depths 43.
... WATER DEPTH 1.25 " LOWERING LINE 5 300 ' NYLON 60mm CORNWALL 3 - STRAND / 8 - STRAND MULTIPLAIT 210 OF 2 " ORQ +8,500 lb CLUMP 20.0 0.0 0 10 20 20 TIME ( SEC ) AFTER ... water depth , but allowing intervention beyond 5,000 ft depths 43.
Page 44
water depth , but allowing intervention beyond 5,000 ft depths by way of the long pendant line . Along with the numerical studies it is anticipated that the physical data will make it possible to predict under what conditions packages ...
water depth , but allowing intervention beyond 5,000 ft depths by way of the long pendant line . Along with the numerical studies it is anticipated that the physical data will make it possible to predict under what conditions packages ...
Contents
Operational | 1 |
Technological Problems Associated With Subsea Development of High Pressure | 17 |
New Concept for a General Purpose Subsea Installation System | 23 |
Copyright | |
10 other sections not shown
Other editions - View all
Common terms and phrases
Agip alignment ball valves boosting unit bore buoy buoyancy cable chain clamps completion configuration connection control force Control System cost crane vessel deep water deepwater deployed deployment line DFCS DIVERLESS downhole drilling end effector equipment feedback field Figure flowline flowline connector fluid Gulf of Mexico heave compensated horizontal Hurricane Opal hydrate hydraulic inspection integration interface jumper LAPV loads located lube oil measurement meters modules motion Motion Compensation multiphase boosting multiphase flow objective trajectory offshore operation package performed phase pipe pipeline Popeye Popeye installation position pressure pull-in pump realized trajectory retrieval Riser and Control riser joint RUNNING TOOL SAF system Scene Reconstruction simulation skid Snamprogetti Sonsub spool Statoil subsea production system subsea structure subsea tree Surface Tree tasks TElerobotic thrusters tie-in tubing hanger tunnel umbilical underwater valves vehicle vessel water depth wellhead winch wireline WOCS