Uniform Building Code, Volume 2International Conference of Building Officials, 1970 - Building laws |
From inside the book
Results 1-3 of 24
Page 57
International Conference of Building Officials. Every combustion chamber opening shall be separated from Circulating Air any fan plenum by an ... Circulating Air Supply ( Continued ) Conditioned Air Supply to 57 1970 EDITION SECTION 706.
International Conference of Building Officials. Every combustion chamber opening shall be separated from Circulating Air any fan plenum by an ... Circulating Air Supply ( Continued ) Conditioned Air Supply to 57 1970 EDITION SECTION 706.
Page 58
International Conference of Building Officials. Circulating Air Supply ( Continued ) Conditioned Air Supply to a warm - air furnace shall be of sufficient area to comply with this Section . EXCEPTION : Such opening when used for a warm - ...
International Conference of Building Officials. Circulating Air Supply ( Continued ) Conditioned Air Supply to a warm - air furnace shall be of sufficient area to comply with this Section . EXCEPTION : Such opening when used for a warm - ...
Page 105
... Air Supply therein , except through an air lock not less than 16 square ( Continued ) feet in area , equipped with tight - fitting doors arranged to close automatically ... air velocity ( 105 1970 EDITION SECTION 1205 Circulating Air Supply.
... Air Supply therein , except through an air lock not less than 16 square ( Continued ) feet in area , equipped with tight - fitting doors arranged to close automatically ... air velocity ( 105 1970 EDITION SECTION 1205 Circulating Air Supply.
Contents
Part Administrative | 9 |
CHAPTER | 15 |
Part IIDefinitions and Abbreviations | 21 |
Copyright | |
17 other sections not shown
Other editions - View all
Common terms and phrases
550 gallons absorption unit Addenda air ducts approved Asbestos-cement automatic boiler Building Official capacity Chapter chimney circulating air supply clearance clothes dryers combustible material combustion air comfort cooling comfort heating comply compressor connected construction Continued cubic feet dampers designed diameter Dichlorodifluoromethane discharge duct system equipment evaporative cooler exceed fire fire-resistance rating flame fuel fuel-burning fusible plug gage galvanized gas vent Group 1 refrigerant horsepower incinerators inlet inspection installed iron pipe size joints less liquefied petroleum gas liquid listed located low pressure machinery room main burner metal Methyl Chloride minimum oil burners opening operating outlet permit plenum portion pounds per square pressure vessel protected psig pump refrigerant piping refrigerating system relief valve Required Required Required room or space sample Section shutoff valve side smoke detector specified square inch Standard steam steel supply tank Table temperature thickness tion Uniform Building Code vapor vent pipes ventilation venting system warm-air furnace