Uniform Building Code, Volume 5International Conference of Building Officials., 1970 - Building laws |
From inside the book
Results 1-2 of 2
Page 5
No owner or occupant or any other person having charge , care or control of any building or premises shall fail or neglect , after proper demand is made as herein provided , to promptly permit entry therein by the Building Official or ...
No owner or occupant or any other person having charge , care or control of any building or premises shall fail or neglect , after proper demand is made as herein provided , to promptly permit entry therein by the Building Official or ...
Page 10
Such application shall contain the location by street and number of the proposed sign structure , as well as the name and address of the owner and the sign contractor or erector . The Building Official may require the filing of plans or ...
Such application shall contain the location by street and number of the proposed sign structure , as well as the name and address of the owner and the sign contractor or erector . The Building Official may require the filing of plans or ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Other editions - View all
Common terms and phrases
advertising alley anchorage Anchors applied approved plastics attached authorized Building Official building or structure Clearance Cloth signs Combination signs conductors conform connection constructed Continued curb designed in accordance display surface electric signs Enforcement entry erected established exceed EXCEPTION extend feet feet above grade Fin signs Fire forces formed frame gauge GLASS greater Ground signs height horizontal inches Inspections intended legal setback line less light located manner MAXIMUM meet the requirements noncombustible materials opening owner painted parapet permit person placed pole signs portion private property PROJECTING SIGN projects over public proper public property reasonable regulating representative requirements requirements specified resist Roof signs seismic loads separate sign or sign sign structure signs and sign SIGNS Sec soil specified in Chapter square feet Stanford steel street stresses supports Table Temporary signs tested thickness tion trim TYPE U.B.C. Standard Uniform Building Code vertical violation Volume wall signs wind wood